The First Step Toward Successful Site Development
When it comes to site development, clearing and grubbing is always the first stage. Clearing is necessary to remove above-ground vegetation, while grubbing removes the stumps, roots, and organic material below grade.
Wynn Site Development handles all the opening phase of full-site work, so you can always trust that the job is getting done right. We follow all North Carolina regulations to ensure that the process is done properly.
You can count on us to exceed expectations on every project we take on. Learn more about the clearing and grubbing services WSD provides and why you can trust us every step of the way.
The Difference Between Clearing and Grubbing
Clearing and grubbing are both necessary because before grading, any buried organic material can decay, leading to uneven settlement under roads, building pads, and foundations.
What is clearing?
Proper clearing is necessary to ensure that the soil is stable enough to support heavy foundations. If buried organic matter is left in the ground, it will eventually rot. This causes the soil to sink and structures to crack. Without proper clearing, construction teams cannot accurately measure the land or plan for proper drainage.
- Surface Preparation
What is grubbing ?
Once everything is cleared from the surface, grubbing is necessary to remove roots, stumps, and other organic matter below the soil surface.
This is the vital second step that is needed before any development can begin.
- Root & Stump Removal
Site Prep Essentials
It’s important to note that clearing and grubbing, along with forestry mulching, both aim to remove unwanted trees, brush, and roots to prepare land for a new purpose. The main difference is how it’s done.
Forestry mulching uses a specialized grinding attachment, such as a skid steer or dedicated tracked mulcher, to get the job done.
North Carolina Regulations
In North Carolina, if one or more acres of land is disturbed, it triggers a legal requirement to submit and receive an Erosion and Sedimentation Control Plan before any construction starts. This plan must be submitted at least 30 days before any land-disturbing activity begins.
Equipment Used for Clearing and Grubbing
Clearing and grubbing use heavy tracked equipment such as bulldozers, excavators, and forestry mulchers.
A bulldozer
Excavators
Forestry mulchers
Stump grinders
Why Hire Wynn Site Development for Clearing and Grubbing
When you hire Wynn Site Development for clearing and grubbing, you can count on us for